Photo Blog

ERC Talk in Vienna, 13-23-2017

ERC Talk in Vienna, 13-23-2017.

DMA-train goes Cyprus, 02-23-2017

DMA-train goes Cyprus, 02-23-2017.

Tube of the LHC @ CERN, 10-28-2016

On top of the tube of the LHC @ CERN, 10-28-2016.

Shipping the DMA-Train, 09-26-2016

Shipping the DMA-Train, 09-26-2016.

Bernhard and Paulus @ Elettra near Trieste, 09-24-2016.

Bernhard and Paulus @ Elettra near Trieste, 09-24-2016.

The Nanodynamite-Team (Christian T., Paul W., Dominik S., Andrea O.) took part at the Vienna City Marathon 2016.

The Nanodynamite-Team (Christian T., Paul W., Dominik S., Andrea O.) took part at the Vienna City Marathon 2016 on April 10th, 2016.
Click here for the results.

Top view of the DMA-Train.

Top view of the DMA-Train.

Overview over the setup of the CLOUD 10 campaign.

Overview over the setup of the CLOUD 10 campaign.

Paul Bauer at the DMA-Train in operation on the current CLOUD 10 campaign.

Paul Bauer at the DMA-Train in operation on the current CLOUD 10 campaign.

Transportation of the DMA train to the CLOUD chamber at CERN, Geneva (September 2015)

Transportation of the DMA train to the CLOUD chamber at CERN, Geneva (September 2015).

Dr. Paul Winkler and Paulus Bauer greasing the sampling port.

Dr. Paul Winkler and Paulus Bauer greasing the sampling port (July 2015, Elettra).

Dr. Paul Winkler inserting the inner flow tube.

Dr. Paul Winkler inserting the inner flow tube (July 2015, Elettra).

Full flowtube setup with air switching module at the SAXS beamline at Elettra.

Full flowtube setup with air switching module at the SAXS beamline at Elettra (July 2015, Elettra).

Showcasing the new DemoSANC at the Campus Festival.

Showcasing the new DemoSANC at the Campus Festival (June 12-14, 2015).

DMA train now in operation at the CLOUD chamber at CERN, Geneva. (c) Dominik Stolzenburg DMA train now in operation at the CLOUD chamber at CERN, Geneva. (c) Dominik Stolzenburg
(photo: © Dominik Stolzenburg)
DMA train now in operation at the CLOUD chamber at CERN, Geneva (May 2015).

DMA-Delivery and DMA-Train-Pumprack-Delivery
Milestone-Event DMA-Delivery and DMA-Train-Pumprack-Delivery by Grimm Aerosol Technik (Feb. 2015).

DMA-Delivery and DMA-Train-Pumprack-Delivery
Milestone-Event DMA-Delivery and DMA-Train-Pumprack-Delivery by Grimm Aerosol Technik (Feb. 2015).

DMA-Delivery and DMA-Train-Pumprack-Delivery
Milestone-Event DMA-Delivery and DMA-Train-Pumprack-Delivery by Grimm Aerosol Technik (Feb. 2015).

Grimm Aerosol nanoDMA
Grimm Aerosol nanoDMA. This DMA will be used six times in the final DMA-Train setup ((Feb. 2015)).

Grimm Aerosol HV-Unit for DMA HV-supply.
Grimm Aerosol HV-Unit for DMA HV-supply (Feb. 2015).

Grimm Aerosol pump rack for the DMA sheath air supply.
Grimm Aerosol pump rack for the DMA sheath air supply (Feb. 2015).

CPC
Six Condensational Particle Counters (CPCs) running in parallel (Jan. 2015).

DMA-Train Design DMA-Train
DMA-Train in the first construction phase during december 2014 and a corresponding design study.

Deposit-Setup
Setup for biogenic aerosol deposition with CPC and DMPS measurement system.

flow tube laser
Laminar flow condition testing with a laser and fume inside the inner tube and pure air as sheath air.

Assembly of the flow tube
Assembling steps of the final flow tube setup with an aluminum holding for the SAXS system at Elettra.

Elettra
Assembling the setup at the SAXS beamline at Elettra.

Elettra
X-ray beam adjustment with green paper (dark green line is the beam).

Elettra
Dr. Paul Winkler with the flow tube and the CPC and DMPS measurement system.

Elettra
Complete flow tube setup with vacuum connection.

Elettra
New adjustments at the beam line with air cleaning modules (black tubes).

Elettra
Automatic air flow switching module with Paulus Bauer and Dr. Heinz Amenitsch.



nanoDynamite


Dr. Paul Winkler
Boltzmanngasse 5
1090 Vienna, Austria
Tel.:  +43-1-4277-73403
Email: paul.winkler[at]univie.ac.at